Cascade Regional Terminal

A two-level regional terminal for 1.8 million annual passengers: a long-span steel concourse with eight contact gates over a ground-level baggage and arrivals hall.

Gross area266,900 sf
Storeys26.50 m floor to floor
Elements4,492191 data rows
Total dev cost$174.3M$653/sf
DeliveryPublicly fundedno capitalised exit

Download .mass · 4.7 MB Executive report All files

Issued drawings

Generated from the model — column positions, wall runs, space polygons and grid spacing are read out of the IFC — so a sheet cannot drift from the building it documents. ARCH-D, 5 of 21 registered sheets issued.

A1.01 — Overall Floor Plan Level 1
A1.01 Overall Floor Plan Level 1open full ↗
A2.01 — Building Elevations
A2.01 Building Elevationsopen full ↗
E2.01 — Power and Lighting Plan Typical Level
E2.01 Power and Lighting Plan Typical Levelopen full ↗
G0.01 — Cover Sheet and Project Data
G0.01 Cover Sheet and Project Dataopen full ↗
S2.01 — Framing Plan Typical Level
S2.01 Framing Plan Typical Levelopen full ↗

LOD record coverage

Share of IfcElement occurrences carrying each part of the record, read out of the IFC inside the container.

LOD stage100%
As-built record100%
Measured dimension100%
Manufacturer82%
Classification100%
Material90%

Manufacturer and material fall short of 100% by the same reason: an IfcOpeningElement is a void and an IfcElementAssembly is a grouping — neither is a thing anybody manufactures or pours.

Assemblies466
Reinforcing bars0
Fasteners1,568
Analytical members818
MEP ports468
Spaces24266,944 sf modelled

Programme

SpaceTypeLevelsArea % of gross
Arrivals hall + baggage claimLobby162,000 sf23.2%
Ticketing and check-inLobby138,000 sf14.2%
Concourse + hold roomsCirculation / Core296,000 sf36.0%
ConcessionsRetail221,900 sf8.2%
Airline and airport opsBack-of-House249,000 sf18.4%

Cost and programme

Largest divisions

05 — Metals$23,017,60017.5%
03 — Concrete$16,063,70012.2%
01 — General Requirements$12,322,8009.4%
23 — Heating, Ventilating & Air Conditioning (HVAC)$10,709,2008.1%
26 — Electrical$10,039,8007.6%

Revised budget $131.4M · forecast at completion $132.4M · variance -0.72%.

Registers

Approvals9
Risks10
Phase gates8
Long-lead packages8
Sheets registered21
Sheets issued5

Unweighted risk exposure $21,791,900 and 275 days, against a carried contingency of 5%.

Schedule — 02 Mar 2026 to 27 Jun 2029, 40 months

PhaseTradeStartFinish Working days
Mobilization and site logisticsSiteworkMar 2026Apr 202635
Mass excavation and shoringSiteworkApr 2026Jul 202661
Foundations and below-gradeConcreteJul 2026Nov 202687
SuperstructureStructureNov 2026Jul 2027174
Building envelopeEnvelopeJul 2027Jan 2028130
MEP rough-inMEPJan 2028Jul 2028139
Interior build-outInteriorsJul 2028Dec 2028113
Finishes and fit-outFinishesDec 2028Apr 202969
Commissioning and turnoverCommissioningApr 2029Jun 202961

Development pro forma

Uses of funds

Land acquisition$00.0%
Hard cost$129,713,40074.4%
Hard cost contingency (5%)$6,485,6703.7%
Soft cost (28%)$38,135,74021.9%
Construction period interest$00.0%
Total development cost $174,334,810100.0%

Returns

Publicly funded asset — underwritten to a funding plan and a lifecycle operating cost, not to a capitalised exit. Return metrics are omitted rather than fabricated from a cap rate that does not apply.

Synthetic sample project. Figures are internally consistent and derived from one set of assumptions in tools/sectors.py — they are not market data.